Formwork and shoring solutions available from RMD Australia (19/11/2007)... than steel forms.The bridge deck is presently being constructed and is supported by 5 rows of 1,000mm deep welded steel beams spanning 21 metres from pier to pier. Total volume of concrete to be used is approximately 3,000m3 and the total ...