Installation and construction of bore hole, pump stations and rising mains by Clm Excavations
Clm Excavations provide utility services and business solutions. Clm Excavations have undertaken installation and construction work for pump stations, boreholes and rising mains. They have completed projects in Elderslie, Greystanes, Oxley Carrier and Mallaty Creek in compliance with on the required occupational health and safety systems and ISO standards. Clm Excavations have installed sewage pump station and rising main in Elderslie. The key components provided to the project include 132L/s pump station with 11m deep wet well, chemical processing unit, 316m long 500mm polyethylene drilled borehole. The rising mains installed by Clm Excavations are 1080m long and 375mm in diameter.
Clm Excavations have installed sewerage pump stations, rising mains and boreholes to newly developed residential lands on Boral Quarry at Prospect. These pump stations and rising mains were installed inside a live open cut quarry. The key components of this project include 63L/s pump station, 340m long micro tunnel for the incoming sewer, 1400m long ring man, 800m stormwater drain and storage pond, 1000m sealed access road, chemical processing unit, emergency storage tank, 1350m high voltage, underground and overhead electrical mains.
15-Aug-2008